The soffit is up in the live room:
First coat of mud complete in the control room:
The live room soffit gets some drywall:
The gas line gets its own box:
The wall outside the studio area has drywall:
Most of the hat channel is up in the live room and the ceiling is hung (2 layers of drywall):
More drywall going up:
I've decided to go with wood laminate flooring. Man, there are a lot of choices out there. I was at Home Depot this morning and found stuff they are blowing out that should do the trick.
I've picked out wall sconces for the live room too.
A lot more pictures here: http://www.hippietim.com/Studio/Studio.htm
Stay tuned...