Monday, March 13, 2006

HippieSound Studios Construction Week 4

The first layer of drywall is going up in the live room:


And now layer two is up in the live room - doesn't look much different does it? :)



Mud is going up on the walls in the live room:






I bought the flooring. This was NOT fun to bring downstairs. That stuff is heavy!


And still more mud in the live room!




We have electricity!!!!

The control room is primed and the areas around the electric boxes are painted. I haven't painted the other areas because some touch ups are needed.


The live room has the wall sconce fixtures up and the areas around the light fixtures and plugs are primed and painted - again the rest of the drywall isn't finished up.


As always, way more pictures than you really care to see are available here: http://hippietim.com/studio/studio.htm