.jpg)
The soffit is up in the live room:.jpg)
.jpg)
First coat of mud complete in the control room:.jpg)
The live room soffit gets some drywall:.jpg)
.jpg)
The gas line gets its own box:.jpg)
The wall outside the studio area has drywall:.jpg)
.jpg)
Most of the hat channel is up in the live room and the ceiling is hung (2 layers of drywall):.jpg)
.jpg)
More drywall going up:.jpg)
I've decided to go with wood laminate flooring. Man, there are a lot of choices out there. I was at Home Depot this morning and found stuff they are blowing out that should do the trick.
I've picked out wall sconces for the live room too. 
A lot more pictures here:  http://www.hippietim.com/Studio/Studio.htm
Stay tuned...