Saturday, March 04, 2006

HippieSound Studios Construction Week 3

Mud is going up in the control room ceiling:



The soffit is up in the live room:



First coat of mud complete in the control room:


The live room soffit gets some drywall:



The gas line gets its own box:


The wall outside the studio area has drywall:



Most of the hat channel is up in the live room and the ceiling is hung (2 layers of drywall):



More drywall going up:


I've decided to go with wood laminate flooring. Man, there are a lot of choices out there. I was at Home Depot this morning and found stuff they are blowing out that should do the trick.

I've picked out wall sconces for the live room too.

A lot more pictures here: http://www.hippietim.com/Studio/Studio.htm

Stay tuned...